
With new full-flow lanes from Interstate 24 westbound to the Purchase Parkway southbound opened on Saturday, the Kentucky Transportation Cabinet has temporarily closed ramps and southbound parkway lanes.
Motorists traveling I-24 westbound through the exit 25 interchange construction zone should be alert for changes in traffic flow that have been created by the new configuration. Westbound motorists on I-24 westbound will now be required to merge left to take the Purchase Parkway south instead of exiting right on the cloverleaf ramp. The new full-flow lanes are designed to eventually allow this westbound to southbound transition at normal interstate speeds.
The closures are expected to be in place for 10 days to allow construction to be complete.