A contractor for the Kentucky Transportation Cabinet plans to install reflective pavement markers on various ramps along the Julian Carroll-Purchace Parkway THIS WEEK. This work will require traffic to be restricted along the ramps at the following locations from Draffenville to Mayfield: Wednesday, August 24 SOUTHBOUND ONLY ON and OFF ramps US 68 Draffenville Exit 47 (first) US 641 Spur Exit 41 (after US 68) Thursday, August 25 SOUTHBOUND ONLY KY 131 Mayfield Exit 27 ON and OFF ramps US 45 Mayfield Exit 25 ON and OFF ramps Friday, August 26 SOUTHBOUND KY 121 Mayfield Exit 24 ON and OFF ramps NORTHBOUND KY 121 Mayfield Exit 24 ON and OFF ramps Motorists should use appropriate caution where equipment, flaggers, and maintenance personnel are along the roadway in close proximity to traffic flow. Brehm Striping is the sub-contractor for this work. It is part of extended general upgrades along the Purchase Parkway aimed at allowing Interstate 69 to be extended southward along the parkway from Calvert City to Mayfield in the future. Timely traffic advisories for the 12 counties of KYTC Highway District 1 are available by going to www.facebook.com/kytcdistrict1<http://www.facebook.com/kytcdistrict1>. You do not have to be a Facebook member to access this page. Navigate traffic with KYTC, www.511.ky.gov<http://www.511.ky.gov>, and Waze, www.waze.com<http://www.waze.com>!